13 points of precautions for mold hot runner installation-Quzhou Kingsoon Precision Machinery Co.,LTD
Release date:2018/12/29 14:27:57

The content expressed in this article is 13 points of precautions for mold hot runner installation-Quzhou Kingsoon Precision Machinery Co.,LTD, please feel free to contact me.



13 points of precautions for mold hot runner installation-Quzhou Kingsoon Precision Machinery Co.,LTD


Hot runner technology, with its unique technical advantages such as cost saving and shortening of molding cycle, has become an important field in plastic injection molding process. The installation of the hot runner is directly related to the quality of the product. The following are the precautions for hot runner installation:

Place the mold, lay the upper mold, and clean all the holes and the template with the air gun.

Check the size of each hole, focus on the depth, and remove the burrs on the template. At the same time, check the screw hole of the lock manifold, and whether the center nail and the anti-rotation hole are finished. The first time the master of the hot runner mold is leaked.

The two parts of the hot nozzle sealing position and the upper step position are matched with the mold.

Test the hot nozzle, then remove the check seal to rub the red Dan, and if the step touches the mold. If not, stop the installation and check the cause of the error to make sure that the fit is tight and not leaking. Be careful not to bump the tip of the nozzle during this process.

Install the hot nozzles at the same time, install the center pad, center pin, anti-rotation pin, and sweep the red on the plane.

Check the height of the nozzle plane and the center pad, and the error is controlled within 0.05mm.

Try the splitter plate. Be careful not to miss the hot nozzle seal when the manifold is officially installed.

Check the cooperation between the manifold and the hot nozzle to ensure that all the red dans are encountered to ensure no leakage.

Finish the hot nozzle to make the line neat and beautiful, and number each line in sequence, and connect the line to the transplanting.

The manifold is officially installed, and the manifold fixing screws are locked (note that the balance must be locked and the height of the four corners of the manifold is consistent). The mesa of the control manifold is higher than the plane of the peripheral frame by 0.10-0.15 mm, and then on the manifold. Sweep red Dan.

Prompt the code template to check whether the plane touches the meson red, and ensure that the template presses the manifold meson.

Lock the mold, raise the mold, and check whether the matching between the gate and the nozzle tip meets the requirements from the parting surface. To make the tip of the nozzle 0.1-0.2mm lower than the gate surface, the tip of the nozzle cannot be eccentric. Use a multimeter to carefully test each group of circuits so that there are no short circuits, open circuits, leakages, etc., and the lines of each group are correct, ensuring that all circuits are normal.

Connect the thermostat to test the heating. The first heating should be within 100 °C, keep warm for 10 minutes for preheating and dehumidification, and protect the heater. Then, warm up to the required temperature. If normal, you can arrange the lifting mold test. mold



13 points of precautions for mold hot runner installation-Quzhou Kingsoon Precision Machinery Co.,LTD


The above content is 13 points of precautions for mold hot runner installation-Quzhou Kingsoon Precision Machinery Co.,LTD. I hope it will help you!




[ Previous] [Next] [Return]
 
ABOUT US
Company
Honor
Culture
Message
PRODUCTS
Display Racks
Plastic spare parts
plastic tool parts
Plastic quick-wear
SERVICE
Marketing
Contact Us
SUBSCRIBE
 
         
 ©Quzhou Kingsoon Precision Machinery Co.,Ltd       ICP:14039074-2        Design:www.kckj.cc       Admin